Aalii about to reach the top floor

Aalii Ward VillageAalii is Ward Village's 5th Residential Tower in the 60 acre master planned community owned by the Howard Hughes Corporation.

As one of the original Aalii Sales Team Members, it is awe inspiring to finally see the building near the top floor and reach one step closer to final completion. 

According to our meetings with the developer it was stated that the building plans to reach the top floor by this Spring. If you drive by you can currently see the lower floors have their windows and lanai railings installed and workers are continuing to work on the upper levels of the building.

Units Still Available for Purchase - Aalii currently has a few studio, 1-bedroom, and 2-bedroom units available for sale and if you are interested. Be sure to register your interest here. As part of the original sales team, I know the ins and outs of the building and can inform you of everything you need to know. The building has not yet established a firm completion date, but we are anticipating completion to be sometime in 2021. 

Aalii Ward Village Construction 2/4/2020

(Aalii Construction Progress - 2/4/2020 from Rinka)

Aalii Ward Village Construction 2/5/2020

(Aalii Construction Progress - 2/5/2020 from the Ae'o Sky Deck)